When was laguardia airport built
Most importantly, the bridges offer a novel solution to a longstanding taxiway challenge at LaGuardia. The island-and-bridges scheme dramatically increased the efficiency of airport operations by moving the new Terminal B some feet closer to the Grand Central Parkway.
This site configuration recaptured 40 acres of land for airside operations—a difficult achievement for the constrained airport that lies wedged between the parkway, Flushing Bay and the East River. The bridge solution enabled contractors to build the new terminal over the top of the existing structure—a move that shaved almost two years off the construction schedule and minimized the impact to ongoing airport operations.
Even at the peak of construction, Terminal B only had to shut down one of the its 35 gates at a time. The simpler, faster construction phasing saved millions of dollars. The new Terminal B celebrates arrivals and departures with equal emphasis, challenging the industry practice of reserving the most monumental spaces for departures while relegating arrivals to low-ceilinged, basement-like zones. Incoming and outgoing passengers share soaring, airy, grand-scaled sequences punctuated by foot-high ceilings and floor-to-ceiling windows that fill the space with daylight.
An outdoor dining area offers dramatic views of Manhattan. Concourses feature ample seating with charging stations across all 35 gates, spacious and modern restrooms with floors that literally sparkle, and nursing rooms for mothers and infants. With an Envision Platinum rating the highest possible , the new Terminal B is the first project to earn recognition under v3 of the framework developed by the Institute for Sustainable Infrastructure.
The Institute evaluated the project on criteria including traditional factors such as reducing emissions, recycling materials, and conserving energy and water. It also looked at more holistic indicators of social and economic sustainability such as minimizing construction impacts, providing employment opportunities for residents, resilient design, and improving mobility and access. Many of the sustainable design strategies enhance the passenger experience. The team focused on creating an optimal building orientation, providing flexibility for constant change, and using natural and locally sourced materials.
Strategic use of daylighting and clear lines of sight highlight important destinations, helping travelers intuitively move through the terminal while reducing the need for artificial lighting.
Even after its construction was completed in , Mayor La Guardia remained a staunch advocate of increasing aviation capacity in NYC. In , the City broke ground for Idlewild Airport, which opened in , although Mayor LaGuardia died in before it opened.
LaGuardia was a large and impressive airport for its time, with its six hangars the largest in the world in By the s, however, the main terminal building, located adjacent to the Grand Central Parkway, was outdated and bursting at the seams.
With it came a rooftop observation deck running the full length of the terminal. The second control tower at LaGuardia Airport opened in The central terminal building saw further expansions in and again in the fall of , when the west wing was extended by 55 feet for greeting areas, baggage belts and other operational requirements.
The end of saw the beginning of construction for a replacement control tower in which operations began in In , more than 28 million passengers used LaGuardia Airport, making it the premier business airport in the business capital of the U.
There, La Guardia made his first public appeal at a hastily arranged press conference. The acre project was impressive, but had its fair share of critics. Friends and families flocked to the airport on weekends just to watch planes take off and arrive from the skyway observation deck. The airfield was officially named LaGuardia Airport after the agreement was finalized in June , three months before Fiorello La Guardia passed away from pancreatic cancer.
The Port Authority enacted a perimeter rule in that limited nonstop flights into and out of LaGuardia to destinations that were miles or less from the airport.
Denver was the only exception to the rule. A few years later, the Port Authority worked to integrate the nearby Newark and JFK airports to local rail lines to create more competition. Despite these restrictions, traffic at LaGuardia continued to grow. Renovation and reconstruction began at the airport in The air traffic control tower designed by American architect Wallace Harrison in was replaced with a more modern facility in October All existing terminals would be rebuilt and connected with terminal bridges.
0コメント